The NPPF centres on a plan-led system where local plans represent the starting point for decision-making. In order for the planning system to operate effectively, it requires that all local authorities have adopted a post-NPPF plan (i.e. adopted after March 2012). A post-NPPF plan gives LPAs greater control of planning decisions and also gives communities much more power to determine where development takes place.
Our research has found that, three years after the introduction of the NPPF, the process of adoption of new plans is slow. Of the 293 English LPAs (excluding London and National Parks), 222 (76%) do not have a post- NPPF plan in place. These LPAs are therefore relying on outdated plans and assessments of housing need.
Of additional concern is that among the LPAs without up-to-date plans are major metropolitan areas such as Newcastle, Liverpool, Manchester, Southampton and Portsmouth. In addition, many of the authorities surrounding London are similarly without up-to-date plans. The situation around London is therefore at risk of exacerbating London’s shortfall rather than seeking to address it.
Of the 222 LPAs without up-to-date plans, 165 are at various stages of preparing a new plan ranging from initial preparation through to the examination stage. This leaves some 57 LPAs that have not started to prepare a new plan. Even where Local Plans have been adopted subsequent to the NPPF being published, our research found that 58% (41 out of 71) are based on SHMAs that pre-date the NPPF. Such plans are at risk of being formulated on an outdated assessment of housing need.