It is important to be clear about what this table shows. The figures are based on only building on brownfield land – all green space such as the Green Belt, squares and commons has been stripped out, as have rivers, canals and lakes. The calculation does not take into account actual local circumstances; such as the urban realm (including local infrastructure) and whether, or how, new homes might be built. It is ultimately down to the market and the planning system to assess this. However, it highlights the extent to which there is the potential to make better use of land in London by moderately increasing housing densities in well-connected areas. Such areas include, for example, large brownfield sites, opportunity areas and housing zones, which the GLA has already indicated as areas that have the potential to support higher densities. Some scenarios about how this could be implemented are set out below, recognising that in every case the opportunities for how densification is achieved will be different, but must always take into account the context of the local area (see Making Better Use Of Land).
Table 4 is a useful starting point to think about how London might meet and exceed its housing target. In total this exercise identifies notional space for approximately an additional 1.46 million new homes, approximately one million more than the current 10 year London Plan housebuilding target. For the reasons stated above, this report is not suggesting that this figure is deliverable. If, however, land could be identified and housing delivery expanded to build just 10 per cent of these one million notional additional homes over the next 10 years, then London would be able to increase its housebuilding target to 52,000 new homes a year. At this level, delivery would be much more closely aligned with housing need.
Challenges and constraints
In the analysis above TfL public transport accessibility levels (PTALs) are used to estimate the capacity within London to intensify land use. PTALs are however only one measure of connectivity. This measurement tells us nothing about train capacity, for example. A place can be well-connected but local train services may be overcrowded at peak times. Likewise, a well-connected location may not necessarily have sufficient social infrastructure such as school places or doctors’ surgeries to accommodate significantly more housing.
These issues are not insurmountable. Upgrades have already taken place on some parts of the Tube network, such as the Northern and Victoria lines. More are underway, for example on the District, Circle and Hammersmith & City lines, with improvements planned elsewhere, such as the Piccadilly line upgrade. Over the medium term, additional transport infrastructure will be added such as Crossrail and over the longer term potentially Crossrail 2. And where housing densities are significantly increased, this is likely to be done as part of a mixed-use development, delivering commercial as well as residential space. Where there is a substantial commercial offering this will help to generate local jobs and could, in some instances, draw a flow of commuters away from other busy areas of the transport network.
In terms of social infrastructure, intensifying land use can help fund better provision. Developer contributions, subject to the viability of a development, can play a part in delivering this infrastructure. More significantly, more intense land use will also generate greater tax intake in the shape of business rates and council tax contributions.