A balancing act between S106 and CIL

There is a need for clarity on the interaction between CIL and Section 106.

The Three Way Trade-Off

Section 106 payments are varying considerably in the emerging CIL world, depending on whether local policy is to scale back Section 106 alongside CIL, or whether significant site specific infrastructure will continue to be funded via Section 106. Some authorities have stated that Section 106 on large sites will be scaled back to amounts in the order of £3,000 per plot, to cover the amounts typically payable for smaller scale road and pedestrian connections, play parks and community buildings.

In other cases, major items of transport and education infrastructure will be funded via Section 106 on the large greenfield sites. At the East Cambridgeshire examination, a higher figure of £10,000 per plot was used as an assumption, but funding of such items of major infrastructure can exceed £15,000 per plot.

Whether Section 106 payments are nearer £3,000 or £15,000 per plot has a dramatic impact on the amount of CIL that is payable within our benchmark amount, as shown in Tables 3 and 4. At the scaled back level of Section 106 of £3,000 per plot (Table 3), the viable level of CIL reaches £170 per sq.m. (around 5% of sales value) in higher value sales markets of £300 per sq.ft., at an affordable housing policy of 30%.

Table 3

However, at the 40% affordable housing policy that often applies in such markets, this is squeezed to £90 per sq.m.

At higher levels of Section 106 of £15,000 per plot (Table 4), the capacity to pay CIL in addition is much lower, falling away to zero in most markets, other than the higher value markets in which sales values exceed £300 per sq.ft.

Table 4

The revised CIL Guidance recognises the need for clarity on the interaction between CIL and Section 106, by formalising the need to be explicit on what is funded via each mechanism during the rate setting process.

As such, the so-called ‘Regulation 123 list’ of infrastructure is now part of the evidence base required during the rate setting process, although it is regrettable that the proposed requirements for formal consultation on any subsequent changes to this list have not been introduced.

Appraisal assumptions

The benchmark is the result of a residual development appraisal, adopting a standard set of assumptions which are shown in Table 5. Amongst these, the appraisal should allow for a competitive return to the developer. We use 20% margin on gross development value across all tenures, in line with evidence that this is a minimum requirement across the cycle.

Table 5

The allowance for on-site infrastructure, at £20,000 per plot, is in the middle of the range of £17,000 to £23,000 per plot outlined in the Local Housing Delivery Group guidance.

The proportion of the site that is developable varies widely. We have assumed 50% of the site is developable for residential use, but this is often lower and can be as low as 30%, in which case the amount available to pay CIL and Section 106 will be lower than the CIL benchmark presented here.